Difference between revisions of "Fixed Costs"
| Line 8: | Line 8: | ||
# Entering the annual cost (e.g. $10,000/year). | # Entering the annual cost (e.g. $10,000/year). | ||
<blockquote> '''Note:''' ‘Fixed Yearly Labour’ should also be added here and users should check the amount of ‘Total Casual Labour’ costs below the table for guidance and to ensure no double counting (machinery or irrigation labour costs may have already been included). | <blockquote> '''Note:''' ‘Fixed Yearly Labour’ should also be added here and users should check the amount of ‘Total Casual Labour’ costs below the table for guidance and to ensure no double counting (machinery or irrigation labour costs may have already been included).</blockquote> | ||
[[File:Add fixed cost.png|1000px|frame|center]] | [[File:Add fixed cost.png|1000px|frame|center]] | ||
Revision as of 02:20, 8 February 2022
This page is used to sum all of the fixed costs, including the cost of insurance, land rates, accounting fees, and building and vehicle repairs and maintenance, and more.
Fixed Costs
Add each of the fixed costs by clicking on the ‘Add Fixed Cost’ button and:
- Selecting the type of fixed cost you are adding (e.g. Insurance);
- Entering the name of the fixed cost (e.g. Farm property insurance);
- Entering the annual cost (e.g. $10,000/year).
Note: ‘Fixed Yearly Labour’ should also be added here and users should check the amount of ‘Total Casual Labour’ costs below the table for guidance and to ensure no double counting (machinery or irrigation labour costs may have already been included).
The fixed cost table will also include annual depreciation (derived from Depreciation page), fixed water costs and fixed electricity costs (both entered in sections below). These costs will all be totalled to calculate the total fixed costs. There is also a reference cost displayed for total tractor and irrigation labour.
Fixed Water Costs
Add water costs by entering:
Area-based ($/ha). For example, Lower Burdekin Water.
- Enter Total area where water charges apply in hectares (ha).;
- Enter the water charge in dollars per hectare ($/ha).;
- The area-based water charges in dollars per year ($/ha) will be displayed for your information.
Volumetric-based $/ML. For example, Sunwater.
Channel Water
- Enter annual water allocation in megalitres per year (ML/yr).;
- Enter Part A and C water charges in dollars per megalitres ($/ML).;
- The channel water charges in dollars per year ($/yr) will be displayed for your information.
River Water
- Enter annual water allocation in megalitres per year (ML/yr).;
- Enter Part A and C water charges in dollars per megalitres ($/ML).;
- The river water charges in dollars per year ($/yr) will be displayed for your information.
Other Charges
- Enter other charges in dollars per year ($/yr).;
- Total fixed water charges in dollars per year ($/yr) will be displayed for your information.
- Press "Submit" to enter in the above data.
Fixed Electricity Costs
Fixed electricity costs will be displayed in the table if there are pumps added to the farm from the Cane Growing Costs, Other Crops Growing Costs, or Irrigation Setup pages. Edits can be made to the tariffs used by the pumps by clicking the edit action button (pencil icon).
Assets ⇐|⇒ Other Income


